Past Projects

Our Past Projects

Client Name: Projects: Area/s: Scope: Status:
Yengweni Enterprises Cleaning Services Ladysmith Various Offices Ongoing
Yengweni Enterprises Construction of Malala Road Department of Justice – (Ladysmith) Lay of Fig 6 kerb, Lay of Fig 6 barrier kerb, Concrete to kerb foundation Completed
Department of Public Works Water Supply Department of Justice – (Ladysmith) Supply domestic drinking water from Local Municipality at 40 000L per week for Three Months Completed
Thulanda Consultants Stationery, Office Furniture and Cleaning Material Supply Eskom Ingula Pumped Storage Scheme Stationery Supply and Cleaning Material Supply Completed
Afrostructures PTY Ltd Zwelibomvu Reservoir Dasenhoek, Pinetown, Thselimnyama, Klaarwater Supply and install diamond wire mesh fence and gates (Soft Excavation) Completed
Durant Civils (PTY) LTD Inner West Side Walk Dasenhoek, Pinetown, Thselimnyama, Klaarwater G Lock Supply per square metre, providing transport services to Site, General clearance and grubbing in the road, Excavation of topsoil to stockpile, Formation, Asphalt residential vehicular access hardening with 150mm G2 graded crushed stone, Lay of Fig 6 kerb as edge restraint on 20mm mortar excluding concrete base, Lay of Fig 6 barrier kerb on 20mm mortar excluding concrete base, Concrete to kerb foundation/ fillet/channel/haunch, Top soil from stockpile Completed
KMC Concepts Management Stormwater Infrastructure in West Central Region (1m – 15624) Westemead Industrial Area, Westville, Cavershan Glen, Dasenhoek, Pinetown, Thselimnyama, Klaarwater Cleaning of Stormwaters, Culverts Completed
Esor Construction Western Aqueduct Phase 2 Project Thselimnyama - Durban General site clearance and dispose, Saw cutting, Remove topsoil, Excavation to formation, Preparation of formation, Supply and lay sub-base (G5) layer, Supply and lay Base (G2) layer, Prime coat to G2 base layer, Supply and lay 25mm asphalt surface, Lay extruded asphalt kerbs Casting concrete base for kerbs, Supply and lay Figure 12 kerbs as edge retraintion, 20mm mortar, Supply and lay Figure 6 barrier kerbs on 20mm mortar, Concrete haunching , Concrete fillet/channel, Backfiling to road edges, Topsoiling to vedges, Grassing to vedges. Building of Stormwaters, sidewalks Completed
K-Line Shipping Company Catering and Decoration Durban Catering and Decoration Completed
Thulanda Consultants Gillits Offices 15 Old Main Road, Gillits, Durban Cleaning of offices Completed
Luyandiza Investments Emadadeni Hospital Edadadeni Hospital Provision of cleaning of buildings and offices Completed